Isocal Technology Test Shows CONTINEWM® Can Save You Money On Your Energy Bill

Isocal Technology Co., LTD. in Bangkok conducted a test using the CONTINEWM® nets - patented solution installed in wall mounted air conditioning unit. The purpose was to compare the power consumption output for 7 days with and without the use of CONTINEWM®. The result proved significant energy saving and demonstrated the capability of CONTINEWM® technology to improve the energy efficiency of air conditioners.

Isocal Technology Co., LTD

To conduct the test, Isocal Technology Co., LTD. utilized equipment, including a Watt Hour Meter, Digital Clamp Meter, and Thermo Recorder. The test method involved setting the temperature at 22 degrees Celsius and electricity usage was monitored for 7 days without the use of CONTINEWM® nets. After that, the same temperature setting was used with MESHIK installed in wall mounted AC unit, and electricity usage was once more monitored for another 7 days.

Installing CONTINEWM® in Wall Mounted Air Conditioner Unit

The Test Results:

Test Wall Mounted Air Conditioner WITHOUT CONTINEWM® NET

Total power consumption used: 110.3 kWh

Test Wall Mounted Air Conditioner WITH CONTINEWM® NET

Total power consumption used: 83.1 kWh

The results of the tests clearly proved that this technology is effective in reducing power consumption. Over the course of the 7-day test period, the air conditioner's operation with CONTINEWM® used 27.2 kWh less energy than it would without it. This leads to an impressive energy savings of 24.66%.

As the demand for energy-efficient solutions continues to increase, MESHIK technology stands out as a promising innovation in the field of air conditioning, promoting substantial benefits to both consumers and the environment.

Step-by-step on how to install CONTINEWM® in Wall Mounted

1. Open the Air Conditioning unit shell

2. Take out the filter.

  • Remember how the filter is positioned

3. Cover the filter with Continewm net and cut according to the size of the filter

  • Cut the CONTINEWM net to fit the filter size. It should cover the filter entirely for maximum efficiency.

4. Put the filter back inside

  • Make sure the filter is in the same initial position

5. Place the Continewm net above the filter securely

  • Make sure that the CONTINEWM net is placed all over the filter. It should be placed all the way back for the grid not to block the net.

  • In some cases, it may be placed below the filter: Then make sure the CONTINEWM net is not in contact with the coil or the evaporator when placing the filter back in.

6. Close the shell

  • Make sure the shell is securely attached

Previous
Previous

Warehouses & Industrial Sites

Next
Next

AHU / PAHU